Operation

Generation

The actual capacity of CEM’s generation consists of two power stations located on the Coloane Island namely Coloane Power Station A (CCA) and Coloane Power Station B (CCB), which are with 271.4 MW and 136.4 MW of installed capacity respectively.

The type of generation technology deployed are the low speed diesel generator (CCA) and the combined cycle gas turbine (CCB). These two types of generating units make up of 66.6% and 33.4% of total capacity installed and accounted 13.0% and 87.0% of total electricity generation in 2021 respectively.

In 2021, the gross energy demand was 5,648.8 GWh, of which 286.9 GWh was produced by CEM and 5,361.9 GWh has acquired from external suppliers. The energy breakdowns between CEM generation and energy acquisition were 5.0% and 95.0% respectively. The annual growth rate is 5.0%. The peak demand was 1037.4 MW.

Coloane Power Station A

generation2.png

Generator Type

Commercial Operation

Installed Capacity

MW

MVA

Steam Turbine

     

G01
G02

1978
1978

20.0
20.0

25.0
25.0

Diesel Fuel-oil

     

G03
G04
G05
G06
G07
G08

1987
1988
1991
1992
1995
1996

24.0
24.0
38.6
38.6
53.1
53.1

30.0
30.0
48.3
48.3
66.4
66.4

Total

271.4

339.3

Coloane Power Station B

generation3.png

Generator Type

Commercial Operation

Installed Capacity

MW

MVA

Cycle Combined

 

 

 

GT1
GT2
ST1

2002
2003
2003

45.1
45.1
46.2

56.4
56.4
57.7

Total

136.4

170.5

New Combined Cycle Gas Turbine Generator

new c.png

  Lower Emissions

(g/kWh) NOx SOx CO CO2
Macau Power Station (CMC) 13.32 5.10 0.79 809.15
Coloane Power Station Units G03 / G08  2.33 1.29 0.42 319.36

New Combined Cycle Gas Turbine (CCGT)

0.29 0.01 0.00 42.54

Reduction(New CCGT vs former Macau Power Station)

-97.8%

-99.8%

-100%

-94.7%