The following table shows the connection fee without CEM work:
Non Residential:
Original subscribed demand |
Required subscribed demand |
||||
---|---|---|---|---|---|
6.9kVA |
11.5kVA |
13.8kVA |
20.7kVA |
34.5kVA |
|
3.4kVA |
MOP 520 |
MOP 1,215 |
MOP 1,560 |
MOP 2,600 |
MOP 4,680 |
6.9kVA |
MOP 695 |
MOP 1,040 |
MOP 2,080 |
MOP 4,160 |
|
11.5kVA |
|
MOP 345 |
MOP 1,385 |
MOP 3,465 |
|
13.8kVA |
|
|
MOP 1,040 |
MOP 3,120 |
|
20.7kVA |
|
|
MOP 2,080 |
Residential:
Original subscribed demand |
Required subscribed demand |
||
---|---|---|---|
13.8kVA |
20.7kVA |
34.5kVA |
|
3.4kVA |
MOP 345 |
MOP 1,385 |
MOP 3,465 |
6.9kVA |
MOP 345 |
MOP 1,385 |
MOP 3,465 |
11.5kVA |
MOP 345 |
MOP 1,385 |
MOP 3,465 |
13.8kVA |
|
MOP 1,040 |
MOP 3,120 |
20.7kVA |
MOP 2,080 |
Remarks:
The above table is for reference only, the actual cost will be subjected to the connection charges notification letter.
Requirement of Cable and Meter Board (Panel):
Subscribed Demand |
Cable size |
Cable Color |
Meter Board / Panel |
---|---|---|---|
3.4kVA |
3x6mm2 |
Brown, Blue and Yellow/Green |
Meter board size (LxW) 300x300mm, 200x400mm Meter box size (LxWxD) 430x380x230mm, 300x540x230mm |
6.9kVA |
3x10mm2 |
||
11.5kVA |
3x16mm2 |
||
13.8kVA |
5x6mm2 |
Brown, Black, Grey, Blue and Yellow/Green
|
Meter board size (LxW) 350x350mm, 250x500mm
Meter box size (LxWxD) 430x380x230mm, 300x540x230mm
|
20.7kVA |
5x10mm2 |
||
34.5kVA (3x50A) |
3x16+N10+T10mm2 |
Remarks:
(1) The height of the meter: 1.0 - 1.7m from the ground to the display of the meter.
(2) If the requested subscribed demand is higher than 34.5kVA, the metering system will be indirectly connected and CT chamber is required. The requirement of the metering box and CT chamber is according to CEM standard.
(3) The above requirement of cable and meter board (panel) is provided to electrical contractor's reference only.
Remarks:
(1) The above diagram is a three-phase direct connection.
(2) All the electrical installation specified in the above meter equipment connection diagram, including the meter board/panel, the cables before and after the meter, shall be responsible by the customers. While the meter and circuit breaker with subscribed demand 34.5kVA or below are under CEM's responsibility.
(3) If no network alternation is involved, the validity of the application is 30 days.
(4) In case the designed capacity limit of the original communal electrical installation of the relevant building is reached at the time of application, customer shall hire an experienced electrical contractor to upgrade the communal electrical installation before applying for a change of subscribed demand.
(5) IIn case the installation of additional facilities is involved in the communal areas due to the application of changing subscribed demand, customer shall take the responsibility to post the upgrade work notice in conspicuous places of the building for 15 days before proceeding.
* For application with no network alternation involved
You can watch the following videos to understand more about what to do for upgrading customer’s installations:
(i) Single Phase to Single Phase (Chinese Only)
(ii) Single Phase to Three Phase (Chinese Only)
(iii) Three Phase to Three Phase (Chinese Only)