Notice

Roadworks

We serve to build a better future for Macau

To support the city development and provide quality power supply to citizens with optimized power grid facility and stable power supply, we are in the process of cable laying in the following area.

During the construction period, citizens and drivers are advised to be aware of the road conditions and follow the temporary traffic instructions. We will endeavor to minimize the impact and hope to have your understanding for the inconvenience caused.

Traffic arrangements

Temporary traffic arrangements for roadworks near Estrada de Hac Sá at Coloane

19 August 2022

Due to the cable, water pipe and pipe laying works carried out by Companhia de Electricidade de Macau - CEM, Macao Water and CTM, single lane traffic by rotation under traffic control signals will be implemented from 22 August (Monday) to 15 October (Saturday) at some sections of Estrada de Hac Sá.

In terms of bus services, the “Hac Sá Village-1” and “Hac Sá Village-2” stations will be temporarily closed from 10:00am on 22 August (Monday) to 15 October (Saturday). Passengers who take bus route 15 (towards Ká-Hó Village) and route 21A (towards T. De Combustíveis Do P. De Ká-Hó) can use the temporary bus stop located at “Avenida de Luís de Camões” near Hellene Garden, which is about 220m away from the original bus stop. Passengers who take bus route 15 (towards Hellene Garden) and route 21A (towards Barra) can use the temporary bus stop located at “Avenida de Luís de Camões”, which is towards Hac Sá Beach and about 100m away from the original bus stop. Due to the setup of temporary bus stops, some metered parking spaces on Avenida de Luís de Camões will be suspended. For details about bus services, please refer to TCM’s website at www.tcm.com.mo/web/NewsVB/data/870_cn.pdf and Transmac’s website at www.transmac.com.mo.

In addition, limited access to the section of Avenida de Luís de Camões near Estrada de Hac Sá and some sections and inner road of Estrada de Hac Sá will be applied from 6 September (Tuesday) to 10 October (Monday).


Temporary traffic arrangements at Estrada da Vitória and Rua da Fonte da Inveja

25 July 2022

Due to the cable laying project of Companhia de Electricidade de Macau - CEM, S.A. (CEM), in order to avoid repeated road excavation, after the coordination of the Transport Bureau, Macao Water, MTel, and a private company will also carry out pipeline laying and sewer connection works simultaneously. To cooperate with the construction, temporary traffic arrangements implemented on the relevant road sections from 23 July (Saturday) to 12 August (Friday). During this period, bus routes 17 and 28C will be diverted. For details, please refer to the table below or visit the TCM’s website: https://www.transmac.com.mo/en/route-change/20220626-01/.

Temporary traffic Arrangements

Temporary traffic measure

Period

Road section

No parking 23 July – 9 August

Some of the metered parking spaces, motorcycle parking spaces & the loading/unloading area at Estrada da Vitória

Limited access

23 July – 12 August

25 July – 9 August

  • A section of Rua da Fonte da Inveja near Jardim de Infância “D. José da Costa Nunes”
  • A section of Estrada da Vitória between Rua da Fonte de Inveja and Calçada da Vitória
Closed to traffic 27 July – 2 August
From 9:30 a.m. to 4:30 p.m.

A section of Estrada da Vitória between Rua da Fonte de Inveja and Calçada da Vitória


Temporary bus arrangements

From 23 July to 12 August

Bus route 

Temporarily suspended bus stops 

Bus stops for passengers

17 (to Macao Cultural Centre) “Chan Sui Ki College” station
“Yuet Wah College” station
“Calçada da Surpresa / Hospital S. Januário” station
“Jardim de S. Francisco” station

“Victory Garden” station
“Tap Seac Square” station
“R. Campo / Vicky Plaza” station
“Octagonal Pavilion” station

28C (To Jai Alai)

“Chan Sui Ki College” station
“Yuet Wah College” station

“Victory Garden” station
“Tap Seac Square” station



Temporary traffic arrangements at Rua da Praia do Manduco, Rua de João Lecaros and Rua dos Armazéns

16 June 2022

Due to the completion of new buildings, CEM, Macao Water, CTM and private construction company will carry out cables, water pipes, pipeline laying and sewer connection works respectively. During the construction period, temporary traffic arrangements will be implemented at Rua da Praia do Manduco, Rua de João Lecaros and Rua dos Armazéns from 20 June (Monday) to 18 August (Thursday). Bus services will not be affected during the project period.

Temporary traffic measures

Date and time

Road sections involved

No parking

20 June to 19 July

The loading/unloading area of Rua da Praia do Manduco near Beco de S. Roque

20 July to 18 August

The loading/unloading area of Rua de João Lecaros near Complexo Municipal Do Mercado de S. Lourenço

Closed to traffic

20 June to 4 July

A section of Rua da Praia do Manduco between Rua de João Lecaros and Beco do Sal

Limited access

5 July to 19 July

A section of Rua da Praia do Manduco near Rua de S. Roque

20 July to 18 August

A section of Rua de João Lecaros and Rua dos Armazéns near Kwan On Building